Type the estimate and the percentage you are quoting. See what reaches your bank after cess, TDS, security and royalty — and where you start losing money.

Type the estimate and the percentage you are thinking of quoting. See what actually reaches your bank after cess, GST TDS, income-tax TDS, the security deposit and royalty — and

Copy this answer for WhatsApp, in both modes; Print with no name now takes you straight to the name box; a ?mode=manpower link opens the GeM manpower view; rules re-read 17 November 2026.

AI tools for chartered accountants

AI tools for chartered accountants

Tender Bid Viability

by CA Karan Gupta

Type the estimate and the percentage you are thinking of quoting. See what actually reaches your bank after cess, GST TDS, income-tax TDS, the security deposit and royalty — and

Last statutory update: 19 Nov 2026 — Copy this answer for WhatsApp, in both modes; Print with no name now takes you straight to the name box; a ?mode=manpower link opens the GeM manpower view; rules re-read 17 November 2026.

Statutory context

**Works contracts have been 18% GST since 22 September 2025** (Notifications 11–17/2025-CT(R) dated 17.09.2025); any pricing habit built on the old 12% government-works entry is stale. GST is not a cost to the contractor but a timing item — section 17(5)(c) blocks credit on works contract services *except where they are an input service for the further supply of works contract service*, which is what a works contractor is doing — so the only GST costs on this page are the working capital of paying output tax ahead of the department, and the 2% deducted under **section 51 of the CGST Act**, which the section itself says is computed on the value excluding the taxes shown on the invoice and which reaches the electronic cash ledger rather than a bank account. **Income-tax TDS is section 393(1), Table Sl. No. 6(i) of the Income-tax Act, 2025** — successor to section 194C — at 2% for a firm or company and 1% for an individual or HUF; it is a credit, never a cost, and treating it as one is the commonest error in a bid sheet after the cess base. **Labour cess** is 1% of the cost of construction under the Building and Other Construction Workers' Welfare Cess Act, 1996, upheld in ***Dewan Chand Builders & Contractors***, Supreme Court, 18 November 2011 — the ₹10 lakh carve-out people quote belongs to the definition of "establishment" and has nothing to do with a government work. **Bid security and performance security** are Rules 170 and 171 of the General Financial Rules, 2017; Rule 171 fixes no works percentage, and the 5% performance guarantee plus 2.5% security deposit this page ships are **CPWD's contract conditions, not a statute**. A mobilisation advance, where one is offered, is CPWD clause 10B — up to 10% at 10% simple interest.

Open the tool

The workspace opens on tools.cakarangupta.com so site login and browser storage stay isolated. Print and local downloads work in the tool itself.

Book a consultation

Feedback