Whether the GST on a captive solar plant can be claimed turns on how the plant is wired and settled, not on the word "captive": on-site plants with no export keep full credit on the advance-ruling
Summary
Whether the GST on a captive solar plant can be claimed turns on how the plant is wired and settled, not on the word "captive": on-site plants with no export keep full credit on the advance-ruling line, partial export means a 60-month reversal under Rule 43, and grid-routed off-site plants settled through energy credits have had all their credit denied in Rajasthan (May 2026) and Tamil Nadu. Civil works are blocked in every case, so split the EPC bill before you sign, not after the audit team arrives.
The situation
A 1 MW plant costs crores, and the GST on modules, inverters, structures and the EPC contract runs to tens of lakhs. Owners are told "it's captive, claim it all". Then a GST audit team asks for the credit back with interest, which is the exact question on a TaxTMI forum thread this year. In Chhattisgarh the push is towards the risky structures: CSERC's order of 24 November 2025 (Sadbhav Renewables v. CSPDCL, reported) lets a virtual-net-metered plant sit away from the consumer's premises. That is the off-site, grid-routed, credits-settled structure two advance-ruling authorities have refused credit on.
The rule
The starting point is s.16(1) of the CGST Act: credit on capital goods used in business is available, except to the extent used for exempt supplies (s.17(2)) or blocked (s.17(5)). Electricity is exempt (Notification 2/2017-Central Tax (Rate), Sl. No. 104). So once the plant's power counts as "supplied" to the DISCOM, the credit behind that power is credit for an exempt supply.
| How the plant is set up | Position | Authority |
|---|---|---|
| On your premises, behind the meter, no export, taxable outputs | Full credit | TN AAR 19/2021 KLF Nirmal Industries (18 Jun 2021); Gujarat AAR Unique Welding Products |
| On-site with net metering and some export, or you also make exempt supplies | Claim in full, reverse the exempt share over 60 months | Rule 43, CGST Rules; practitioner view, TaxTMI issue 121039 (21 Jul 2026) |
| Off-site, power injected into the grid, energy credits against the factory bill, no wheeling-and-banking agreement | All credit at risk | Rajasthan AAAR SBF Ispat (P.) Ltd., Order 02/2026-27 (20 May 2026); TN AAR 01/ARA/2025 Kanishk Steel Industries (6 Feb 2025) |
| Off-site with a wheeling-and-banking agreement and matched generation and drawal | Defensible, still contested | What SBF Ispat itself distinguished; not a holding |
| Gross metering (all power sold), or your own outputs wholly exempt | No credit | s.17(2); Maharashtra AAR AES Engineering (Jul 2024) |
In SBF Ispat, the AAAR held that "the title in the electricity passes to the DISCOM upon injection into the grid" without a wheeling-and-banking agreement, that the credits were consideration, and that one GSTIN for plant and factory did not help, because the supply ran to the DISCOM. That is how it is reported in TaxHeal's summary.
Against that, the Madras High Court stayed the State's assessment order denying Kanishk Steel's credit. It recorded a prima facie view that routing power through the grid and drawing an equal quantity at the factory "may not" be a supply (reported 13 June 2026). No later order had been found as at 15 November 2026. It is an interim view, not a ruling.
Civil works. Under s.17(5)(c) and (d), credit is blocked on works contracts and on construction of immovable property, except plant and machinery. The Explanation to s.17 includes the foundations and structural supports of plant and machinery, but excludes land, buildings and other civil structures. The Finance Act 2025 made the "plant and machinery" wording retrospective from 1 July 2017 after Safari Retreats. So module-mounting structures and their foundations stay in. A control room, boundary wall, roads, levelling and drainage are out.
Where people go wrong
"Captive" is treated as the test. In SBF Ispat, "captive" was read as describing where the power is generated. It did not decide who received the electricity. A plant 300 km away feeding the grid is captive under electricity law and can still be an exempt supplier for GST.
Net metering is assumed to be the same as behind-the-meter. On-site with net metering and a surplus exported is the middle case. No advance ruling has tested it, and Rule 43 asks for the exempt share to be reversed. Whether CSPDCL settles a year-end surplus in units or pays for it in money bears on the "consideration" point. I have not read that settlement term, so check your own agreement.
Credit is under-claimed. Rule 43 does not say "claim 85%". It says claim the capital-goods credit and reverse the exempt share each tax period over 60 months. Claiming less up front leaves money on the ledger for no reason.
The EPC lump goes in unsplit. A single EPC invoice that mixes modules, structures and civil works invites the department to treat all of it as works contract. Get the split in the contract and on the invoices.
An advance ruling is quoted as law. Under s.103 a ruling binds only the business that asked and its officer. No Chhattisgarh, Madhya Pradesh or Odisha ruling on captive solar has been found. If you are in the at-risk or reversal rows, an advance ruling in your own State is the only route to certainty.
What to do
- Write down four facts before the PPA or net-metering papers are signed: where the plant sits, how it connects (zero-export, net, gross, wheeling and banking), what share is exported, and whether you sell anything exempt.
- Insist on an EPC contract and invoices that separate equipment, structures and foundations, and civil works.
- For an on-site plant with export, claim the full credit and set up a monthly Rule 43 reversal from the export meter readings.
- For an off-site plant, put a wheeling-and-banking agreement and matched metering on record, or provide for the whole credit at risk.
- Where the rupees are large and the structure is in an uncertain row, apply for an advance ruling in your State before claiming.
The tool
I kept redrawing the same five-box table for steel-belt clients adding solar, so I built a page for it. You give five answers (location, connection, exempt sales, export share and the GST on the plant), plus the civil-works figure if you have it. It returns one position: full credit, claim and reverse over 60 months, at risk, defensible but contested, or no credit. You get the rupee split, the civil works shown as blocked, the rulings with their dates, the change that would move you to a safer row, and a one-page position note for the file. It does not split an EPC lump for you, does not compute the exact Rule 42/43 reversal from turnover, and does not decide whether your DISCOM's settlement is "consideration". The rulings are quoted from reported summaries.
Open the solar itc position page
Use it free, and verify with your CA.
Sources
- CGST Act, 2017, ss.16, 17, 103; CGST Rules, Rule 43; Notification 2/2017-Central Tax (Rate), Sl. No. 104.
- TaxHeal, Rajasthan AAAR SBF Ispat (P.) Ltd., Order 02/2026-27, 20 May 2026 — https://www.taxheal.com/?p=140897
- TN AAR 19/2021, KLF Nirmal Industries, 18 Jun 2021 — https://gstcouncil.gov.in/sites/default/files/AAR/tn_aar_19_2021_18.06.2021_klf_nipl.pdf
- CAclubindia, Gujarat AAR Unique Welding Products — https://www.caclubindia.com/judiciary/gst-itc-available-on-installation-of-solar-power-panel-as-electricity-so-generated-captively-used-for-manufacture-of-taxable-goods-4116.asp
- SAG Infotech, TN AAR Kanishk Steel Industries, 6 Feb 2025 — https://blog.saginfotech.com/gst-aar-no-itc-goods-services-used-operate-10-2-mw-solar-plant
- JurisHour, Madras HC interim order in Kanishk Steel — https://www.jurishour.in/gst/gst-order-denying-itc-captive-solar-power-plant/
- taxo.online, Maharashtra AAR AES Engineering, Jul 2024 — https://taxo.online/latest-news/08-08-2024-no-itc-on-the-solar-power-plants-procurement-costs-due-to-the-exempt-nature-of-their-output-supplies-i-e-supply-of-electrical-energy-maharashtra-aar/
- Grant Thornton on the Finance Act 2025 "plant and machinery" amendment — https://www.grantthornton.in/link/57f26307cc91461781abe8064d7bf354.aspx
- TaxTMI forum issue 121039 (Rule 43 reversal view) — https://www.taxtmi.com/forum/issue?id=121039
- SolarQuarter on CSERC virtual net metering, 26 Nov 2025 — https://solarquarter.com/2025/11/26/cserc-clears-path-for-virtual-net-metering-allowing-off-site-solar-plants-to-serve-multiple-consumers-in-chhattisgarh/
- TaxTMI forum issue 120238 — https://www.taxtmi.com/forum/issue?id=120238
Share line (for WhatsApp / LinkedIn — Karan pastes it once the article is live)
Solar plant GST credit: on-site with no export keeps it; off-site grid credits lost it all in Rajasthan (May 2026). Civil works blocked always. Check yours: Open the solar itc position page